Before: Old bathtub and severely outdated bathroom
The leak had already caused serious damage beyond the unit:
- Damage to the bathroom in the unit below
- Water penetration into the main-floor commercial store
- Active dripping directly above where a customer was sitting inside the store
Due to the extent of the damage, we began a full demolition to locate the source and assess all hidden issues.

Hidden Mold & Major Installation Failures Discovered
After removing all walls, floor tiles, and subfloor, we discovered extensive mold growth throughout two bathrooms.
During the removal of the upper-floor bathroom ceiling, we identified a critical ventilation failure:
- Roof vent pipe was 4 inches
- Exhaust fan ducting was only 3 inches
- Instead of using a proper reducer, insulation was packed around the connection
- This caused constant air leakage, moisture buildup, and insulation turning completely black
Additionally, there was no vapour barrier installed in the bathroom ceiling.
Proper Repairs & Moisture Protection (Done to Code)
All contaminated materials were fully removed and discarded, including:
- Improper ducting
- Mold-damaged insulation
- Affected ceiling and wall materials
We then installed:
- New insulation
- A full vapour barrier system
- Proper taping and sealing around the entire bathroom envelope



Professional Mold Treatment & Structural Restoration
All exposed framing and surfaces were treated using
RMR-86® PRO Instant Mold & Mildew Stain Remover
- Applied three separate treatments
- All water-damaged subfloor sections were completely removed
After mold remediation, we applied:
- Zinsser Mold Stop Primer
- Two full coats for long-term mold prevention and odour control




Plumbing System Upgrade & Safety Improvements
During inspection, we also discovered that the units had no individual water shut-off valves, creating a major risk.
To properly upgrade the system, we:
- Removed all drain piping from the commercial store level to the roof
- Replaced old copper drains with a new XFR drainage system
- Upgraded all water lines from Type M to Type L copper
- Installed new shut-off valves
- Installed a new shower control system
This upgrade significantly improved safety, durability, and future serviceability.




Waterproof Bathroom Rebuild & New Installation
We rebuilt the bathrooms from the ground up:
- Installed new subfloors
- Installed a new bathtub
- Installed XPS waterproof tile backer panels
- Fully waterproofed:
- All corners
- All seams
- Tub-to-wall transitions



Final bathroom installation included:
- Tile installation
- New plumbing fixtures
- New vanity and mirror

Kitchen Upgrade (Additional Renovation)
The kitchen condition was also very poor.
📸 (Before photo)
We completed a full kitchen upgrade:
- Removed old backsplash tiles
- Installed 60 × 60 cm (2 ft × 2 ft) marble-look tiles
- Installed a new quartz countertop




Final Result
✔ All leaks permanently fixed
✔ Mold safely removed
✔ Plumbing system fully upgraded
✔ Bathrooms rebuilt with full waterproofing
✔ Kitchen modernized
Another happy customer — and a renovation done the right way.